Note: The step is painted with a UV resistant topcoat over the black POR 15.
The visible portions of the rails will topcoat painted soon.
The portions of the frame that are cut out for the plumbing connections - all will be strong! Each cross member will be strengthened at the bottom with a heavy steel bolt-on bridge. The bolts will allow access to the plumbing if needed at a later date.
The dump valve is installed & valve handles extended through the main rail into an are that will be accessible through a flip down hatch.
Gray tanks installed!
Fiberglass Insulation to really keep us warm!
First piece of the belly pan is cut!!!! We are moving forward again!
+Prefitting+Reflectix+in+frame+-+Step+painted+over+the+POR15.jpg)
+Dump+valve+installed.jpg)
+Grey+tank+final+installation.jpg)
+Fiberglass+insulation+installation.jpg)
+Insulation+installation.jpg)

+Bathroom+sink+&+shower+drain+to+grey+tanks.jpg)
+Flexible+link+between+grey+tanks+and+foam+insulation+to+keep+the+tanks+from+shifting.jpg)
+Black+and+gray+tank+dump+valve+accessible+through+a+belly+pan+hatch.jpg)
+web.jpg)
+Fresh+&+grey+water+tanks+pre-fitted.jpg)
+Shower+drain+trap+will+fit+inside+the+belly+pan.jpg)